CUSTOMER & END PRODUCT
- Supplier assembles wheel sets for train wagons and overhead crane wheels
SITUATION
- Train bogie wheels are assembled with a heavy interference fit: typically 0.009" for a 9" dia shaft
- A press-on tonnage of between 65-110 tonnes must be achieved
- Consequences of poor assembly can be expensive or even catastrophic
- If metal pick-up (galling) occurs during assembly, the components are scrapped
- Lubricants give lubricity during assembly but fail to promote adhesion or prevent moisture ingress over prolonged periods
LOCTITE® SOLUTIONS
- Loctite® 232 Wheel Mount is designed to facilitate assembly of heavy interference fits
BENEFITS
- Loctite® 232 lubricates during assembly, preventing galling and metal pick-up
- Seal mating parts to prevent corrosion; increases service life of assembly; parts don’t get damaged during disassembly
- Enhances assembly strength
|
|
Figure 1
Figure 2
|